Case Studies
Jamestown Manufacturing Ltd. recently fabricated two 3.5 metre internal diameter industrial kettles for use in lead recycling at the Envirowales Recycling Plant in Ebbw Vale, South Wales. The kettles were made by Jamestown to the customer's precise specifications, using rolled
When sections of the Cuningar Loop pedestrian bridge were lifted into place over a meander in the river Clyde in east Glasgow, the bridge was being put together for the second time. To ensure a perfect fit, a trial erection of the
Jamestown faced difficult challenges on this project. The construction techniques employed by the project called for a very high degree of accuracy in the making of the large steel brackets. The Steel components, that were fabricated off-site, needed to match perfectly
Two of the bridges (at Mauldeth Road and Fog Lane) were on the vital Manchester Airport railway line, which made adherence to the overall project schedule especially critical. The previous Mauldeth Road bridge had been in place for over a
Jamestown Manufacturing made a major contribution to the construction of the largest urban shopping centre in Europe when we produced large steel girders for the Westfield Shopping City Extension project in Stratford, East London. Westfield Stratford City Severfield (NI) were the contractors for this 1.9