Jamestown’s journey began in Inchicore, Dublin in the mid 1990’s as a steel stockholding and profiling business. From those early days Jamestown has since established itself as a leading supplier of Plate Girders, Cellular Beams, Crane Gantries, Bridge Structures, and many other complex fabrications.
Moving to Newbridge in 2003 was indeed a milestone in the company’s development and whilst investment continued in Plasma and Oxy Fuel Profiling Machines, Jamestown installed its first T & I Automated Beam Welding Line and the manufacture of Plate Girders and Cellular Beams commenced.
Having outgrown the Newbridge site, Jamestown relocated to the current 17 Acre site in Portarlington in 2015. With 180-metre-long workshops and extensive laydown areas outside, the manufacture of large Crane Gantries, Road and Rail Bridges and Offshore Structures have become Jamestown’s staple.
Further investment in large Blast & Paint facilities capable of handling structures up to 56 metres long has established Jamestown as a major provider of large quality steel components and structures to many leading customers and projects throughout Ireland and the UK.
Jamestown was created by the Sherling Steel Group in July 1994 located at Jamestown Inchicore.
Added 10mx2.5m Profiling machine with one Plasma torch and two Oxy torches.
Stopped producing Cladding and focused on Profiling. Added two Plasmas and a dedicated Oxy Profile machine.
Added a second Oxy machine and another plasma profiler, a two Headed HT2000 HySpeed.
Out grew the space at Inchicore and moved to Newbridge, Co. Kildare, 25,000 Sq. foot factory space on 0.6 of a hectare site.
Added another Oxy and Plasma machine, press brakes and Radial drills.
Added a T&I Automated Beam Welding Line to the facilities and began producing plates girders and cellular beams.
Achieved Certification to ISO9000.
Added 25,000ft2 of Fabrication space in Dublin.
FPC Certification to Execution Class 4 by SCCS.
QMS Certification by UKAS, ISO9001.
Moved business to Portarlington to 100,000 ft2 facility on a 9 hectare site.
Added additional equipment and machinery, T&I Lines, Cranes.
NHSS20 Certification.
Extended Plasma/Oxy/ Drilling facilities, (2 x 30m Cutting beds, 24x4m 2xTorch Plasma added).
Added 45Te capacity Straddle Carrier to increase lifting/handling capacity.
Installed and commissioned 36m long x 7m wide Blast tunnel.
Installed and commissioned 42m long x 7m wide Paint hall.
Received RQSC Certification.
Received Construction Line Silver Certification.